Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Color: | Grey |
| Appearance: | Liquid |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
The construction process of anti-corrosion coatings typically includes key stages such as pre-construction preparation, surface treatment, coating application, and quality inspection. Below are the detailed steps:
Material Preparation:
Confirm the coating model and performance meet design requirements.
Check the shelf life and properly mix primers, intermediate coats, topcoats, and hardeners as per ratios.
Tool Preparation:
Prepare spraying equipment (e.g., air compressor, spray gun), brushing tools, sandpaper, grinders, masks, and gloves.
Substrate Inspection:
Ensure the base (metal/concrete) is flat, free of cracks, oil, or rust; repair if necessary.
Environmental Requirements:
Temperature: 5°C-35°C; humidity ≤85%.
Avoid rain, strong wind, or dusty conditions.
Rust Removal:
Use sandblasting, shot blasting, or manual grinding to remove rust/oxidation, achieving Sa2.5 (uniform roughness) or St3 (no visible rust).
Degreasing:
Wipe with solvents to remove oil and dust.
Grinding:
Remove loose particles and smooth the surface; fill cracks with putty.
Drying:
Ensure moisture content ≤8% to prevent blistering.
Primer Application:
Apply evenly via brushing/spraying (50-80μm thickness).
Allow drying per manufacturer's instructions (typically >24 hours).
Intermediate Coat:
Apply after primer curing (e.g., fiberglass-reinforced coat) for thickness/impermeability.
Sand smooth post-drying.
Topcoat Application:
Apply 2-3 layers for weather/chemical resistance.
Total thickness: 200-300μm (industrial use); inspect for bubbles/voids between layers.
Visual Check:
Coating must be smooth, free of sagging, cracks, or pinholes; color uniformity required.
Thickness Test:
Use a thickness gauge (3+ random checks per ten squre meter; ≥90% compliance).
Adhesion Test:
Cross-cut test: No peeling = pass.
Spark Test:
Use a holiday detector to locate coating defects; repair if leaks found.


1.Are You Factory Or Trading Company?
We are Manufacturer
2.How about the price ?
We can offer the best wholesale price which depend on the quantity of the order.
3.I need to make sure the quality and the color .
Our pleasure!We can offer the liquid Free sample for you to test and color chart.
4.If the product is not ideal, what can we do?
We have perfect after-sales service to help to complete the construction smoothly.
Even if there are any unexpected things in your order, we will assist to solve them.
5.What's your MOQ (min order quantity),production period and delivery time?
Our MOQ is 100Kg. We accept mixed order and the production period and delivery time are 7-10 days.
6.Can I have my logo on the package?
Of course! Customized logo, customized packaging and graphic customization are available.