Customization: | Available |
---|---|
Color: | Customize |
Appearance: | Liquid |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Color | Customize |
Drying Time | Surface time <2 hours (at 25°C) |
Theoretical Coverage | 10-12 m²/kg/coat (based on 30 μm dry film thickness) |
Storage | Store in a cool, dry, and well-ventilated area. |
Construction Instructions
1. The base material should be solid, flat, dry, clean and free of oil stains. The moisture content of the base material should be ≤10%, and the pH value should be 7-9.
2. Construction methods: brushing, rolling, spraying. It must not be diluted with clean water before use.
3. Construction conditions: The relative air humidity should be <85%, and the construction temperature should be 5-35ºC. Construction is strictly prohibited in windy, rainy or snowy weather.
4. Recoating interval: more than 4 hours.